HULL FLOODS
HULL FLOODS

Project Manager and CDM-C for Hull floods re-instatement project, which involves re-instating some 130 houses to habitable conditions after the floods. total value of the works being £5.4m. Responsible for the control of 8 contractors and a team of surveyors and office staff to ensure the works are complete in a timely manner and of a high standard as well as controlling all costs associated with the project. (Wikipedia)

press to zoom
FRIARAGE HOSPITAL, NORTHALLERTON
FRIARAGE HOSPITAL, NORTHALLERTON

Provision of Planned Preventative Maintenance Manager at Northallerton’s Friarage Hospital. The role included creating planned maintenance schedules for the whole hospital site including plant rooms, wards etc.(By Chrisloader)

press to zoom
TRAVELODGE HARTLEPOOL
TRAVELODGE HARTLEPOOL

CDM-Coordinator Services for the construction of a five-storey 65-bed Travelodge Hotel, Hartlepool. (© Copyright JThomas.)

press to zoom
ROYAL MIDDLEHAVEN HOUSE
ROYAL MIDDLEHAVEN HOUSE

Project Manager for Sheraton House & Royal Middlehaven House refurbishments on behalf of developer client. Responsible for preparing and issuing all contract documentation, awarding of all sub contracts on site and the day to day running of the project ensuring the projects were complete within the agreed financial budget. (Pythonproperties.co.uk)

press to zoom
DECENT HOME SURVEYS
DECENT HOME SURVEYS

Project Manager undertaking Decent Home Standard and HHSRS surveys on over 6000 homes for local authority and Housing Association clients. Responsible for liaising with the clients, and coordinating a team of 16 Building Surveyors and 5 data control technicians. (© Copyright David Hignett. )

press to zoom
VESSEL RE-LINING PROJECT – SSI UK
VESSEL RE-LINING PROJECT – SSI UK

Project Manager for vessels re-lining project at SSI Steelworks, Redcar. The role included workload scheduling and day to day management of both in-house and sub-contract labour within a safety critical environment. (Stuart Kerr - Corus Steel Works, Redcar.)

press to zoom
Caustic Tank replacement
Caustic Tank replacement

Nigel Sharp Consultancy Services managed team of sub contractors during this delicate project, who provided electrical works, and successfully secured in place a 40,000L caustic storage tank

press to zoom

We have experience working with clients  across the UK.  We provide advice and guidance to our clients from inception to completion, bringing our staff's expertise and skills to each project.

Please click on the pictures below to view a brief summary of our most recent experience.

MERSEY TUNNEL FIRE MAIN REPLACEMENT
MERSEY TUNNEL FIRE MAIN REPLACEMENT

Senior Project Manager for the replacement of the safety-critical fire main within the tunnel. The existing main had to remain live at all times throughout the project until safe de-commissioning and removal could take place, requiring careful management and coordination of the contractor’s on site activities. Despite these operational challenges the £3.5m project was completed early, under budget and with no accidents. (image Wikipedia)

press to zoom
PROJECT ORIENT – BALFOUR BEATTY
PROJECT ORIENT – BALFOUR BEATTY

Senior Project Manager/CDM Co-Ordinator for the re-fit of existing office accommodation on behalf of Balfour Beatty including full stakeholder management and co-ordinating the moves of some 300 people into the newly refurbished buildings. (image from k2 space)

press to zoom
DEFENCE ESTATES TERM CONTRACT
DEFENCE ESTATES TERM CONTRACT

Senior Project Manager responsible for six staff working on five different RAF bases located throughout Lincolnshire and Cambridge. Duties included financial reporting, resourcing and internal cost forecasting. (Wikipedia)

press to zoom
NORTH TEES & HARTLEPOOL NHS
NORTH TEES & HARTLEPOOL NHS

Schemes comprise complex alterations to the existing fabric and service infrastructure to create a new Respiratory Care Suite, Trust Executive Offices, new lift installations, Substation and Maternity suites. Alterations are undertaken in a fully operational hospital and require innovative construction solutions and careful planning/ coordination to maintain efficient working for staff and users. (© Copyright Philip Barker)

press to zoom

Projects